Malaysia Has Seen A Remarkable Boom In Industrialization In The Past Century In Almost All Sectors Of Economy; The Oil And Gas Sector Being No Exception. The Oil And Gas Sector Plays A Vital Role In The Malaysian Economy Due To Its Significant Contribution To Workforce And Government Activities, As Well As To Its Share Of Energy Provisions. There Have Been Numerous Earthquakes In The Region That Caused Tremors On Malaysian Soil. Due To Recent Big Earthquakes, There Was A Sudden Need For A Seismic Hazard Analysis (SHA) For Malaysia That Would Help Designers Choose Appropriate Design Considerations. There Has Been Numerous Seismic Hazard Studies So Far That Includes Malaysian Territories. However, There Is A Need To Assess How Reliable Those Studies Are. Two Main Potential Contributors To Error Have Been Identified: 1) Seismic Hazard Analysis Method And 2) Ground Motion Prediction Equation (GMPE). The Amount Of Variation In Predicting Erroneous GMPE Is Huge. Thus, This Paper Concentrates On Generating New GMPEs Due To Subduction Specified For Malaysia And Validated Against Developed GMPE.